Print Farm Labor Per Order: A Touch-Time Worksheet
Count the minutes a person actively spends on an order, then allocate shared batch work once. Printer runtime, waiting for cooling and operator touch time are different resources. There is no defensible universal labor allowance for every 3D printed order.
A small repeat item can take little setup but substantial picking and packing. A custom part can consume most of its labor before printing begins. Measure the workflow you sell rather than borrowing a minute-per-order figure from another farm.
Start with observable tasks
- File review, customer clarification and revision handling.
- Slicing, placement, supports, material preparation and job setup.
- Part removal, support removal, cleanup and inspection.
- Assembly, labeling, order picking, packing and dispatch handling.
- Rework and failed-attempt handling that the order actually caused.
Prusa's pricing calculator separates preparation and postprocessing labor from machine operation. The distinction is useful; its example defaults are not a wage recommendation or measured standard for your shop.
Use a timer without double-counting people
Record start and stop times for active work. Pause when the operator switches to another order or a machine runs unattended. If two people work together for five minutes, record ten person-minutes. If one person watches three printers for the same five minutes, do not assign fifteen active minutes without a stated allocation rule.
Keep paid shift time and productive touch time as separate totals. Supervision, interruptions and unused capacity can belong in overhead or a broader capacity model. Hiding them inside every task timer makes the result difficult to interpret.
Worked example: five orders on one batch
Assume eight minutes of shared setup, twelve minutes of shared removal and inspection, and four minutes of packing for each of five orders. Total labor is 8 + 12 + (5 x 4) = 40 person-minutes. Equal allocation gives eight minutes per order.
At an illustrative loaded labor rate of $24/hour, eight minutes costs $3.20. Those numbers are assumed, not GoodPrints3D production measurements. If one order requires an extra ten minutes of assembly, assign that direct work to it rather than quietly spreading it across unrelated orders.
Choose the allocation that matches the work
Equal shares can suit identical orders. Part count can suit similar items with different quantities. Timed direct work is better for custom finishing or assembly. Keep the chosen rule visible, especially when a batch mixes products that create very different handling burdens.
Record date, order_type, task, person_minutes, batch_id, allocation_basis, accepted_units, rework. Retain individual observations; a single average conceals unusually difficult jobs.
Use the sample to improve the operation
- Collect a representative spread of repeat and custom work.
- Find the tasks with the largest total minutes, not just the slowest memorable order.
- Change one source of handling: a fixture, label routine, support strategy or batch grouping.
- Measure again with comparable jobs and accepted output.
Do not price only the successful print attempt if failed jobs consume operator time. Equally, do not charge twelve hours of labor just because a printer ran overnight. The result should explain what a person actually did and which shared work was allocated.
Evidence note: this guide combines the cited public documentation with GoodPrints3D analysis. Any numerical example labeled illustrative uses assumed inputs; it is not a GoodPrints3D equipment test. Sources reviewed November 19, 2026.
Sources and references
- Prusa: 3D printing price calculator: separate preparation and postprocessing labor inputs