EOS P 500 vs EOS P 770: Build Volume, Materials and Production Fit

The EOS P 500 and EOS P 770 are industrial polymer laser-sintering systems. The P 770 offers a larger stated build volume for PA 2200, while the P 500's smaller nominal envelope may fit a production plan that does not need that extra space. Decide using the exact material process, representative parts, site requirements and a complete quote. These are manufacturer specifications, not results from hands-on testing.

For the P 500's reviewed specifications and buying context, see the EOS P 500 printer hub and buyer guide. Discuss ownership in the EOS P 500 owner forum. For the P 770, see its printer hub, buyer guide and owner discussion.

EOS P 500 vs P 770 specifications

Specification EOS P 500 EOS P 770
Build volume 500 × 330 × 400 mm 700 × 380 × 580 mm for PA 2200
Lasers Two 70 W CO₂ lasers Two 70 W CO₂ lasers
Maximum scan speed Up to 10 m/s Up to 10 m/s

EOS says the P 770's specified build volume depends on the material; the dimensions above are for PA 2200. Confirm the envelope for the intended powder and process. Nominal dimensions do not guarantee that a particular part fits with its required orientation, clearance, cooling and tolerances. Equal laser specifications and scan-speed limits do not establish equal throughput, quality or cost per accepted part.

Build volume and production fit

The P 770's stated PA 2200 envelope is larger along all three listed axes. It may be worth evaluating when a representative part or packing plan needs that space. The P 500 is worth evaluating when its envelope accommodates the parts and production plan. Compare sample builds, nesting, thermal behavior, cooling, unpacking, finishing and inspection before treating the larger envelope as a capacity advantage for a specific job.

Materials and qualification

EOS lists PA 2200 for both systems. Its P 770 data sheet also names other materials, including PA 1101 and PA 3200 GF. The P 500 product page and data sheet list different material routes, so confirm the exact powder, system configuration and currently released process with EOS. Do not transfer a process from one model to the other. Qualify finished parts against their own dimensional, mechanical and application requirements.

Installation and running costs

Request current site-preparation documents and itemized quotes for both configurations. Check utilities, access, floor loading, ventilation, powder handling, training, service and post-processing equipment. EOS lists powder-handling and finishing accessories as options; confirm what each quote includes. Calculate cost per accepted part from the proposed workload, powder refresh, labor, cooling, maintenance, rejects and finishing. No verified purchase price or independent throughput comparison is available here.

Which should you choose?

Shortlist the P 500 if its released material process and nominal space support the work. Investigate the P 770 if its larger PA 2200 envelope or a separately confirmed material process is necessary. Ask EOS or a qualified provider to produce representative parts under the proposed process, then compare inspection results, total workflow and quotes. An external production service is also worth comparing if demand is uncertain.